Home Flooring: Floor Tiles, Wall Tiles, Parquet and Installation Preparation

A practical guide to preparing surfaces, choosing flooring work and checking the details before and after installation.

The appearance of a new floor depends on more than the tile or board you choose. An unsuitable or uneven base can lead to movement, cracks, poor drainage or damaged finishes later. Preparation and installation details deserve attention before work starts.

Floor tile installation

Some services are listed for prepared areas starting at a 3 x 3 size. Confirm the dimensions, measurement unit and minimum job size with the provider. Laying onto a ready surface is a different scope from removing existing tiles and preparing the base.

Old adhesive, uneven areas and damaged substrates need assessment before the new finish goes down. Do not assume that covering an existing problem will resolve it.

Details that affect the result

  • A base suitable for the selected tile and adhesive system.
  • Level and alignment in dry areas, with appropriate falls towards drains in wet areas.
  • Suitable grout spacing and movement provisions, following the installation system.
  • Planned tile layout, edge cuts and transitions to adjacent rooms.
  • Appropriate treatment around doors, corners and fixtures.

Discuss these details before agreeing the work, particularly where a new floor changes door clearance or finished height.

Kitchen and bathroom wall tiles

Wall tiling may be offered for areas such as 3 x 4, or as removal and replacement of an existing finish. Confirm the actual measurements and what is included.

Straight vertical alignment and neat corners matter, but tiles and grout alone should not be assumed to provide the complete waterproofing system. Wet-area preparation, penetrations and the layers behind the tiles need appropriate assessment.

Parquet and wood-style flooring

Parquet can suit bedrooms and living spaces when the product and conditions are compatible. The substrate must be dry and sufficiently even, with moisture checks and installation requirements appropriate to the chosen flooring.

Follow the manufacturer's requirements for movement gaps and underlay or adhesives. Traditional wood flooring should not automatically be treated as suitable for a wet room. Products marketed for moisture resistance still have specific installation and care limits.

Complete new flooring projects

A full project may involve removal, disposal, base repairs, levels, drainage falls, waterproofing and the final finish. Clarify each stage rather than assuming a tile-laying price covers all preparation.

Share photos, room dimensions, the existing finish and any dampness or loose areas so the provider can plan an appropriate visit.

Before installation

  • Measure the area and agree a cutting and waste allowance. Around ten percent is a common planning estimate, but the layout, product and pattern can require a different amount.
  • Check that batches and shades match before installation.
  • Keep spare material for future repairs.
  • Clear the work area and confirm waste removal and access arrangements.
  • Agree the layout and edge details before fixing starts.

After installation

Allow the adhesive, grout and other materials to cure for the time specified by their manufacturers before walking on or washing the surface. Remove residue only by an approved method that will not damage the finish.

If you notice movement, cracking, poor drainage or areas that sound hollow, ask the installer to assess them. A hollow sound alone is not a complete diagnosis, but concerns should be recorded before furniture makes access difficult.

Service locations

Check flooring options and current availability:

How to request service

In the Njik app, choose flooring, select the required work and add your location. Describe the area and preparation needs, confirm the scope and follow the request through completion.

Need a technician?

Flooring Services

View the service